ROTTERDAM MINERALS

ROTTERDAM MINERALS


ABOUT

Scheepvaartbedrijf Nero B.V. is a one of the key player in the storage and logistics chain of the Port of Rotterdam. Scheepvaartbedrijf Nero B.V. jetty, pipeline and 1,700,000 cubic meter storage facilities are dedicated to optimizing the operation of oil refineries and traders. The highly flexible terminal contributes significantly to the elimination of de-mining and other delays. It's 100 percent open, 100 percent (24/7) available. Scheepvaartbedrijf Nero B.V. has 300 tanks of varying sizes, many of which can be heated. With its advanced blending equipment, customers can blend their products to any specification they needs.


PRODUCTS
Edible oils, Fuel oil, cutter stock, gas oil, gas oil components, diesel, gasoline, gasoline components, VGO, ethanol, methanol, blend kero, soya oil, rapeseed oil, bio diesel, MTBE and ETBE.

SERVICES
Blending, heating, client pump-overs, board-board, fully dedicated systems for each customer.

TANK TRUCK LOADING RACK
Through its Tank Truck Loading Rack Scheepvaartbedrijf Nero B.V. offers a unique access to the Dutch gasoline and diesel market. The highly automated state-of-the-art facility serves a substantial part of the Dutch market. Daily 250 tank trucks can be handled, with an average truck turn-around time of 40 minutes only. The Tank Truck Loading Rack is open 24/7.
Additional capacity is available to tailor to customer’s wishes, like:
– new mineral and chemical products
– dedicated in-line blending of specific additives for gasoline and diesel

OPENING HOURS
Maritime shipping, inland shipping and trucks: 24 hours 7 days a week, all year round.

PERSONAL PROTECTIVE EQUIPMENT
Mandatory personal protective equipment (PPE): Helmet, body covering work clothing, safety shoes and safety glasses.

HARBOUR
3108

CAPACITY
1.100.000 m3

NUMBER OF TANKS
103

TYPE TANK
Mild steel, Mild steel coated, Mild steel insulated, Internal floating roofs ( k1 tanks only) and Tank heating.

TANK SIZE
Ranging from 1,000 m3 - 30,600 m3

ACCESS BY
Seagoing vessels till 250 m, Coaster, Barges

NUMBER OF JETTIES
9

TRUCK LOADING STATIONS
10

BERTHS
4 for SGV, 14 for barges

MAX. DRAFT
13.50

MAX. LENGTH
250 m (275 m as from Q3 2016)

MAX. WIDTH (BEAM)
45 m (50 m as from Q3 2013)

CLASSIFICATION TANKS
K1, K2, K3, K4

CERTIFICATION/ RECOGNITIONS
ISPS, ISCC, AEO

CATEGORY
Tank storage

ROTTERDAM PERNIS


ABOUT

The port location in Rotterdam (Pernis) is the perfect base for clients from around the world. The terminal is in operation 24/7 and has a storage capacity of 625,000 cubic metres. An additional 200,000 cubic metres will be added in the coming years to respond to the growing demand for storage.


SEVERAL LOADING AND UNLOADING STATIONS

Pernis has several train loading stations and two discharging stations where twelve containers can be discharged simultaneously. For maximum flexibility, all rail movements are handled with the company’s own locomotive. There is a connection to the Rotterdam-Rhine Pipeline (RRP), enabling the transportation of fluids as far as Germany.


PRODUCTS

Products such as vegetable oils & fats/ oleo-chemicals/ base oils / waxes/ biodiesel & easy chemicals.


SERVICES

Steam heating, hot water heating, air mixing, blending, on-site laboratory, dedicated systems, weighing, nitrogen blanketing, kosher storage, halal storage, 24/7 service and customs services.


OPENING HOURS

Maritime shipping and inland shipping: 24 hours 7 days a week, all year round
Truck loading: Mon to Fri 6:00 am– 11:00 pm (last acceptance 8:00 pm)
Public holidays: Closed for truck loading


PERSONAL PROTECTIVE EQUIPMENT

Mandatory Personal Protective Equipment (PPE): Helmet, body covering work clothing, safety shoes and safety glasses.
Parts of the terminal are HACCP area. Alternative personal protective equipment could be applicable.
Jewellery should not be worn visible.


HARBOUR NO.

3250


CAPACITY

625,000 m3


STAINLESS STEEL

160,000 m3


MILD STEEL

465,000 m3


TANK SIZE

Ranging from 150 m3 - 22,000 m3


ACCESS BY

Vessel up to Panamax size, coaster, barge, truck and railway. There’s also the possibility for connection to the RRP pipeline.


TRUCK LOADING STATIONS

14


RAILWAY LOADING STATIONS

2 with locomotive


BERTHS

3 for SGV, 11 for barges


DRAUGHT

13.65 m


CERTIFICATION / RECOGNITIONS

ISPS, GMP+, ISO 22000, ISO 9001:2008, ISCC, NOFOTA, FOSFA


CATEGORY

Tankstorage

 


 

  • Oil Storage
  • Chemical Storage
  • Engineering, Procurement & Construction
  • Dry Bulk
  • Biofuels
  • Gas Storage